2018
Investment: new nickel line; the first compact prefabricated substation in metallic enclosure transportable in open top container
2017
Growth of manufacturing portfolio with ESTO-CID: RETROFIT solution for medium voltage cubicles, using power block switch with plug-cased resistant to internal arc; B&K Electro System expands its warehouse network for stock products across the country
2016
Investment: B&K Electro System inaugurated a new production unit in Nistru for manufacture of electricity control and distribution apparatus. New products: medium voltage switchgear for transformer stations (ES 02 Plus).
2014-2015
Investment: Metalworking factory including cutting, bending and welding processed of thick sheets, non-ferrous foundry, galvanizing, plastic injection. Investment: central laboratory, assembly workshop for primary distribution switchgear
2012-2013
New investment, mechanic workshop equipped with: “ thermal zinc coating system “ welding machines “ metal sheet and profile processing machines
2011
 Modernization of the concrete structures workshop. New products: “ primary distribution cubicles “ inverter cabinets (PV-Box)
2010
Modernization of the mechanic workshop. Furnishing of the galvanization workshop
2009
Investment: widening of the medium voltage distribution panels. New products: “ overhead power lines “ overhead substations “ low voltage distribution panels
2008
Investment: substation mounting site Cublice design Medium voltage load-break switches design and fuse bases
2007
Investment: B&K Electro System warehouse (PIF: June 2007) Investment: low and medium voltage distribution panels production facility (PIF: Dec. 2007)
2006
Investment: new company head office (PIF: Apr. 2006) Broadening of low voltage distribution panels production
2005
Investment: metal structures production site (PIF: Sept. 2005)
2004
 Investment: new production site for: “ foundations “ substation assembly (PIF: Dec.2004)
2003
 Production of MT distribution panels: “ insulated overhead conductor bar “ commutation equipment in SF6 (load-breakers) and vacuum (circuit breakers)
1999
 Investment: substation production site “ Homologation of substations with Electrica “ Production of compact prefabricated substations
1998
Representative in Romania of Peters&Thieding (Germany): “ compact prefabricated substations “ medium voltage cubicles